McDATA ULTRANETTM EDGE STORAGE ROUTER 3000 User Manual

Page 357

Advertising
background image

B-11

Initial Power-On Procedure

5. Turn the power switch(es) to the On (

) position (this activates the

systems initial loading routine). The power switch is located
directly above the power cord, see Figure B-4.

Verify status with the indicator lights and the Alphanumeric
messages

window display on front of the unit. (See the “Indicators,

Switches, and Interfaces” section in Chapter 2 for descriptions of the
indicators and alphanumeric displays or the “LED Diagnostic Codes”
section in Chapter 13, Troubleshooting and Diagnostics).

Figure B-4

Power Supply Switch

After power up, the diagnostic display will toggle between VXOK
and BOTP. The UltraNet Edge 3000 is then ready for the UltraNet
ConfigManager configuration.

Figure B-5

Diagnostic Display

Sb035

I

Sb108

Advertising