H3C Technologies H3C WX3000 Series Unified Switches User Manual

Page 629

Advertising
background image

61-6

Figure 61-3

Network diagram for Monitor Link configuration

BLOCK

Switch A

Switch B

GE1/0/1

GE1/0 /2

Switch C

Switch D

Switch E

GE1/0 /1

GE1/0 /2

GE1/0/3

Server

GE1/0/2

GE1/0/2

GE1/0/1

GE1/0/1

GE1/0/3

GE 1/0/11

GE1/0/10

PC 1

PC 4

PC 3

PC 2

Configuration procedure

1) Enable Smart Link on Switch A and Switch B to implement link redundancy backup. Perform the

following configuration on Switch A. The configuration on Switch B is the same as on Switch A.

# Enter system view.

<switchA> system-view

# Enter Ethernet port view. Disable STP on GigabitEthernet 1/0/1 and GigabitEthernet 1/0/2.

[SwitchA] interface GigabitEthernet 1/0/1

[SwitchA-GigabitEthernet1/0/1] stp disable

[SwitchA-GigabitEthernet1/0/1] quit

[SwitchA] interface GigabitEthernet 1/0/2

[SwitchA-GigabitEthernet1/0/2] stp disable

# Return to system view.

[SwitchA-GigabitEthernet1/0/2] quit

# Create Smart Link group 1 and enter Smart Link group view.

[SwitchA] smart-link group 1

# Configure GigabitEthernet 1/0/1 as the master port of the Smart Link group and GigabitEthernet 1/0/2
as the slave port.

[SwitchA-smlk-group1] port GigabitEthernet 1/0/1 master

[SwitchA-smlk-group1] port GigabitEthernet 1/0/2 slave

# Configure to send flush messages in VLAN 1.

[SwitchA-smlk-group1] flush enable control-vlan 1

2) Enable Monitor Link on Switch C and Switch D and enable the function of processing flush

messages received from VLAN 1. Perform the following configuration on Switch C. The operation
procedure on Switch D is the same as that performed on Switch C.

Advertising