Rockwell Automation 1785-Lxxx Enhanced and Ethernet PLC-5 Programmable Controllers User Manual

Page 22

Advertising
background image

Publication 1785-UM012D-EN-P - July 2005

1-4 Understanding Your Programmable Controller

PLC-5/30 Controller Front Panel

l

Use this port with ASCII or DF1 full-duplex, half-duplex
master, and half-duplex slave protocols. The port's
default configuration supports processor programming:

one stop-bit
BCC error check
no handshaking

DF1 point-to-point
2400 bps
no parity

battery indicator (lights red when the
battery is low)

controller RUN/FAULT indicator (green
when running; red when faulted)

force indicator (amber when
I/O forces are enabled)

channel 0 communication status indicator
(green when the channel is communicating)

channel 1B status indicator (lights green and red)

PLC-5 family member designation

channel 0-25-pin D-shell serial port; supports standard
EIA RS-232C and RS-423 and is RS-422A compatible

Install memory module here

Use these labels to write information about the
channel: communication mode, station addresses, etc.

keyswitch; selects controler mode

channel 1A communication port;
its default configuration is DH+

channel 1B communication port;
its default configuration is remote I/O scanner

Install battery here

8-pin mini-DIN, DH+ programming terminal
connection parallel to channel 1A

channel 1A status indicator
(lights green and red)

Channel 0 is optically-coupled (provides high electrical noise immunity) and can be used with most RS-422

equipment as long as:

termination resistors are not used
the distance and transmission rate are reduced to comply with RS-423 requirements

Configure these 3-pin ports for:

remote I/O scanner,
remote I/O adapter,
DH+ communication
unused

1

1

2

2

2

Advertising