Rockwell Automation 1785-Lxxx Enhanced and Ethernet PLC-5 Programmable Controllers User Manual

Page 333

Advertising
background image

Publication 1785-UM012D-EN-P - July 2005

Instruction Set Quick Reference D-33

Category

Code

Title

Time (

µ

s)

Integer

Time (

µ

s)

Floating Point

Words of
Memory

(1)

True

False

True

False

Sequencer

SQI

sequencer input

7.9

1.3

5-9

SQL

sequencer load

7.9

3.5

4-7

SQO

sequencer output

9.7

3.7

5-9

Immediate I/O

(2)

IIN

immediate input

• PLC-5/11, -5/20,

and -5/20E

• PLC5/30, -5/40,

-5/40E, -5/40L
-5/60, -5/60L, and
-5/80, -5/80E

• 357
• 307

1.1

2

IOT

immediate output

• PLC-5/11, -5/20,

and -5/20E

• PLC5/30, -5/40,

-5/40E, -5/40L
-5/60, -5/60L,
-5/80, and -5/80E

• 361
• 301

1.1

2

Zone Control

MCR

master control

0.16

0.16

1

Program Control JMP

jump

8.9+(file# - 2)
* 0.96

1.4

2

JSR

(3)

/RET

jump to subroutine
/return

— 0 parameters

— 1 parameter

— increase/
parameter

12.3

16.1

3.8

1.0

1.0

not applicable

not applicable

17.3

5.0

not applicable

1.0

not applicable

3+paramete
rs/JSR

1+paramete
rs/RET

SBR

1+
parameters

(1)

Use the larger number for addresses beyond 2048 words in the controller’s data table.

(2)

Timing for immediate I/O instructions is the time for the instruction to queue-up for processing.

(3)

Calculate execution times as follows: (time) + (quantity of additional parameters)(time/parameter). For example: if you are passing 3 integer parameters in a JSR
within a PLC-5/11 controller, the execution time = 16.1 + (2)(3.8) = 23.7 ms

Advertising