Buhler 2425 User Manual

Page 177

Advertising
background image

SECTION 2 - OPERATION

2-119

4. Be sure that the PTO drive shaft halves have

adequate overlap and will not separate when

turning.
Pull drive halves apart until fully extended,

just before they come completely apart. This

is dimension A.
From dimension A, subtract 152.4mm (6″),

establishing dimension B.
IMPORTANT: Never operate equipment with

the driveline extended past dimension B.
Push drive halves together as far as possible.

This is dimension C. Add 25.4mm (1″) to

dimension C to establish dimension D.
IMPORTANT: Never operate equipment with

the driveline collapsed past dimension D.

Figure 2-156

DIM “D” EQUALS

DIM “C” + 25.4MM (1 in.)

5. Be sure that all shields are in place and in

good condition. They must fully shield the

driveline.

6. Ensure that the PTO master shield, 1, is in

position.

DANGER: NEVER REMOVE OR ALTER THE

PTO MASTER SHIELD AT ANY TIME TO

ASSIST IN ATTACHING ANY TYPE OF

IMPLEMENT.

Figure 2-157

1

PTO Operation

1. Stop the engine and park the tractor. Connect

the drawbar to the implement hitch. Turning

the engine off releases the PTO brake,

allowing the stub shaft to be hand turned for

spline alignment. Be sure the drive shafts are

straight for easier connection.

2. Attach the implement drive shaft to the tractor

output shaft. Check for adequate telescope

action and for clearance to the surrounding

frame. The drawbar clevis, 1, can be flipped

over to provide additional clearance for the

PTO drive shaft.

Figure 2-158

1

Advertising
This manual is related to the following products: