SECTION 2 - OPERATION

2-149

IMPLEMENT HOOK-UP

3-Point Hitch Implements

IMPORTANT: Before hitching implements to the

3-point hitch, be sure that the implement is

compatible with the tractor hitch.

CAUTION: BE SURE THAT NO ONE IS

BETWEEN THE TRACTOR AND IMPLEMENT

WHEN BACKING UP THE TRACTOR.

Before attaching 3-point hitch implements, be

sure that the drawbar does not interfere when

the implement is raised or lowered.

CAUTION: SHUT THE TRACTOR OFF WHEN

HOOKING UP AN IMPLEMENT.

1. Back the tractor so that the lower link hitch

points are even with the implement

connections.

2. Connect the lower links to the implement with

the correct size hitch pins and secure with

klick pins.

3. Adjust the upper link length and setting on

the link bracket. Connect the link to the

implement with the hitch pin and lock with

klick pins.

IMPORTANT: The hitch pins must fit snugly

into the connection points. If loose, the

implement and tractor have different hitch

dimensions. Verify the correct hitch category.

4. Level the implement.
5. Install sway blocks and shims as required.
Semi-integral Implements

1. Large rear-mounted equipment is usually

connected to the two lower lift links only.

2. Attach the implement in the same manner as

a 3-point hitch implement, but do not connect

the upper link. The lower links lift the

implement front, and a remote hydraulic

cylinder lifts the rear.

3. See the “Hydraulic System Operation” earlier

in this section for information on the

connection of hydraulics to lift semi-integral

implements.

CAUTION: WHEN SERVICING IMPLEMENTS

MOUNTED TO THE 3-POINT HITCH, BE

SURE THAT THE IMPLEMENT IS PROPERLY

SUPPORTED WITH BLOCKING.