Float (Mechanical)

To put the lift links into mechanical float position,

remove the pin, 1, securing the lower link to the

hole on the lift link. Reconnect the lower link to

the lift link using the slot on the lift link. Reverse

this procedure to convert to non-float position.

When in this position, the hitch will float

approximately 76mm (3″) when fully lowered.

NOTE: Full float position is achieved by

adjusting the hitch position knob on the side

console to its float detent position when in

the automatic mode.

Figure 2-196

1

Sway Blocks

Sway blocks, 1, have two positions for use with

the 3-point hitch. When the blocks are in the

sway position, the lower links can move side to

side approximately 51mm (2″). When in the

non-sway position, the lift arms will be limited in

their side-to-side movement when hooked to an

implement.

Figure 2-197

1

When the sway blocks, 1, are in the sway

position, the block is rotated so that the narrow

end of the block is downward.