INFICON STC-2002 Thin Film Deposition Controller Operating Manual User Manual

Page 226

Advertising
background image

p STC-2002

DEPOSITION CONTROLLER

y

SECTION 6.XX

e page 224 of 276 ^

0 RNMD_FALSE

1 RNMD_TRUE

______________________________________________________________________

Parameter 8

Substrate Shutter Status

Value Range

0,1

Units Closed,

Open

This parameter indicates if the substrate shutter is open or closed. A returned value of 0 indicates that the
shutter is closed and a value of 1 indicates that it is open. This is a read only parameter.
access: SRCSHUT bitmap true(1) when source shutter open, false(0) if closed. One per active source ident
(1..8) LSB to MSB. In non-codeposition systems, only one shutter can be open at any one time.

0 ALL SOURCE SHUTTERS CLOSED

1 Source # 1 SRCSHUT OPEN

2 Source # 2 SRCSHUT OPEN

4 Source # 3 SRCSHUT OPEN

8 Source # 4 SRCSHUT OPEN

16 Source # 5 SRCSHUT OPEN

32 Source # 6 SRCSHUT OPEN

64 Source # 7 SRCSHUT OPEN

128 Source # 8 SRCSHUT OPEN
255 ALL SOURCE SHUTTERS OPENED

______________________________________________________________________
Parameter 9

Phase Status

Value Range

0 To 17

Units None
This parameter indicates the phase that the STC-2002 is in according to the following Table:
0 Power

Up 1 Stopped

2 Crystal

Verify

3 Rise

1

4 Soak

1

5 Rise

2

6 Soak

2

7 Soak

Hold

8 Shutter

Delay

9 Deposit

10 Rate

Ramp 11 Deposit

After

Rate

Ramp

12

Time Power Recovery

13

Rise 3

14 Idle 15 Idle After Time Power
16 Manual

17 Ready

Table 6.12: Phase Status.
This is a read only parameter.
access: SQPHS sequencer phase, holds one of PCD_class (process code) data.

0 PCD_pup Power Up.

1 PCD_szp Stopped/Zero power.

2 PCD_bxvfy Crystal Verify.

3 PCD_ris1 Rise 1.

4 PCD_sok1 Soak 1.

5 PCD_ris2 Rise 2.

6 PCD_sok2 Soak 2.

7 PCD_skhl Soak Hold.

8 PCD_sdly Shutter Delay.

9 PCD_dpos Deposit.

10 PCD_rtrp Rate Ramp.

11 PCD_dpo2 Deposit phase after a rate ramp

12 PCD_tpwr Time power recovery phase

13 PCD_ris3 Idle ramp.

14 PCD_idlpr Idle power after successful deposit.

15 PCD_idltp Idle after ending deposit with a time/power phase.

16 PCD_manl Manual phase

17 PCD_rdy Ready phase

Advertising