MTS Series 793 Application User Manual

Page 165

Advertising
background image

Sequence Your Processes

MTS MultiPurpose TestWare®

Creating a Practice Test Procedure

165

3. Specify a “Procedure is done when” trigger.

Set the Procedure is done when trigger to Return to Zero.Done. This ends
the procedure when the Return to Zero process ends.

4. Specify Start triggers for each process in the Group table.

A. Click the Group process icon

on the procedure table.

B. Click

on the MPT Procedure Editor toolbar.

C. Observe that the Start trigger for the Trigger at 75C process is

<Group>.Start. This causes this process to start when the Group
process starts.

D. Observe that the Start trigger for the Switch Fan On process is

Trigger at 75C.Done.

E.

Observe that the Start trigger for the Trigger at 50C process is Switch
Fan On.Done
.

F.

Observe that the Start trigger for the Switch Fan Off process is
Trigger at 50C.Done.

5. Specify a “Group is done when” trigger.

Leave the Group is done when box blank. The Group process
automatically ends when all the processes within it ends.

This is the Procedure is done
when
control. When the trigger
we select for this control is
received, the procedure
terminates. In this case, we are
choosing the Return to
Zero.Done
trigger.
This means the procedure
terminates when the Return to
Zero
process generates a done
trigger.The procedure can
terminate prematurely if one of
the defined interrupts occur, that
is, if the Fatigue Part process
receives a done trigger from the
Monitor Continuity process.

Advertising
This manual is related to the following products: