Metrohm 788 IC Filtration Sample Processor User Manual

Page 26

Advertising
background image

2 Installation

788 IC Filtration Sample Processor

18

6 Rinse ultra-filtration cell

x Before rinsing the cell, please finish all tubing connections as

described in the following sections.

x Every time the filtration membrane is changed, the remaining

air in the cell and tubings has to be removed. This can be

done by rinsing with ultrapure water.

x A completely installed 788 IC Filtration Sample Processor with

ultra-filtration cell is required for processing the following

steps. The rinsing solution (e.g. ultrapure water) is stored in a

300 mL PE bottle on the special beaker position 1. The 788 IC

Filtration Sample Processor is online and in normal state. The

pump is switched of (display: 'PUMP–') and the 788 is ready

for use (display: 'ready').

x Turn the sample rack to position the beaker with the rinsing

solution under the needle by pressing <MOVE> followed by

choosing 'spec.1' with <SELECT>.

x Lower the lift into rinse position with <LIFT> and <SELECT>

'rinse'

x Turn on the pump by pressing <PUMP>. All connected

tubings and the ultra-filtration cell will be rinsed.

x After adequate time (e.g. 5 min.), switch off the Pump

(<PUMP>) and raise the lift to its rest position by pressing

<HOME>.

Advertising