2 Installation
788 IC Filtration Sample Processor
36
Settings in the «790 Personal IC» program
A time program must be drawn up for the selected system which first
produces an impulse at remote lead 3 to start sample changing on the
788 IC Filtration Sample Processor and then switches the injection
valve to the "Fill" position. A further impulse is then produced to start
filling the sample loop within 240 s. At the end the injection valve is
switched to the "Inject" position, which also starts data acquisition.
Run conditions
In order that the joint operation of 790 – 788 functions properly the
program must be started first on the 788 IC Filtration Sample
Processor, then the "Sample Queue" on 790 Personal IC.