4 adjusting the clock manually, Adjusting the clock manually -61 – Yokogawa Touch Screen GP20 User Manual

Page 245

Advertising
background image

2-61

IM 04L51B01-01EN

Operating the GX/GP

1

2

3

4

5

App

2.7.3

Checking FTP File Transfers (FTP transmission test)

You can check whether files can be sent from the GX/GP to the FTP server using a test file.

Procedure

1

Press

MENU.

The menu screen appears.

2

Tap the

Browse tab and then FTP test.

The FTP transmission test screen appears.

3

Tap

Primary or Secondary.

The test file is sent.

Operation complete

Items to Check before Performing This Test

• Connect the Ethernet cable correctly. For the connection procedure, see section 3.6,

“Optional Terminal Wiring” in the First Step Guide.

• Check that the Ethernet interface settings are correct. For the setup procedure, see

page 1-123 in section 1.16, “Configuring the Ethernet Communication Function”.

Checking the Results of the FTP Test

• When an FTP test is executed, a test file named FTP_TEST.TXT is transferred to the

specified FTP destination directory.

• You can also check the result of an FTP test using the FTP log ( see page 2-41 in section

2.3.5, “Displaying Logs”), Web display ( see section 3.1, “Using a Web Browser

to Change the GX/GP Settings, Monitor Data, and Control the GX/GP (Web server

function)”), and FLog command (see the setting commands in the communication

command manual).

2.7.4

Adjusting the Clock Manually

You can adjust the clock manually through touch operation. The SNTP client must be

enabled.

For details on the SNTP function, see page 1-130 in section 1.16.5, “Setting the SNTP Client

Function”.

Procedure

1

Press

MENU.

The menu screen appears.

2

Tap the

Universal tab and then SNTP.

The clock is adjusted.

Operation complete

2.7 Performing Network Related Operations

Advertising
This manual is related to the following products: