Yokogawa Touch Screen GP20 User Manual

Page 357

Advertising
background image

5-3

IM 04L51B01-01EN

Maintenance and T

roubleshooting

1

2

3

4

5

App

5.1.3

Performing A/D Calibration and Adjusting the Input Accuracy

Preparing the Instruments

1

Wire the GX/GP and the calibration instruments as shown in the following figure, and

adequately warm up the instruments (the warm-up time of the GX/GP is at least 30

minutes).

2

Check that the operating environment such as ambient temperature and humidity is

within the standard operating conditions (see “General Specifications”).

Operation complete

Wiring for DC voltage range

Wiring for RTD range

CH1

CH2

CH1

CH2

+

DC voltage/current standard

Hi

Lo

Make the resistance of three lead wires equal.

b

A

Resistance standard

H
L
G

B

A

B

b

Short the input terminal of CH1 (apply 0 V)

Short the input terminal of CH1 (connect 0 Ω)

Input terminal of CH2

Input terminal of CH2

5.1 Maintenance

Advertising
This manual is related to the following products: