Chapter 10

Safety Configuration and Verification

Basics of Application
Development and Testing

Configuration for the intended SIL CL3, PLe, or Cat 4 system must be carried
out by the system integrator or an operator trained and experienced in safety
applications. The developer must follow good design practices.

Use functional specifications, including flow charts, timing diagrams and

sequence charts.

Perform a configuration review.
Perform configuration validation.

Commissioning the System

This flowchart shows the steps required for commissioning a Speed Monitoring
safety system. The items in bold are explained in the following sections.

Figure 47 - Commissioning a Safety System Flowchart

Specify the Safety Configuration

Project Verification Test

Configuration Signature ID Generated

Configure the System

Configuration Signature ID

Generated

Tests

Passed?

Yes

No

Confirm the Project

Record the Configuration

Signature ID

Lock the Configuration

Verify Signature ID and Lock Status

Make Required Modifications