Achronix ACE Version 5.0 User Manual

Page 159

Advertising
background image

Views

Chapter 3. Concepts

The View’s pull-down menu (to the right of the Toolbar buttons) contains some shortcuts to run the four
stages of timing analysis.

Critical Paths View Drop-down Menu Actions (Asynchronous)

Action

Description

Run Prepared Timing
Analysis

If selected, runs the Prepared Timing Analysis flow step.

Run Post-Place
Timing Analysis

If selected, runs the Post-Place Timing Analysis flow step.

Run Post-Route
Timing Analysis

If selected, runs the Post-Route Timing Analysis flow step.

Run Final Timing
Analysis

If selected, runs the Final Timing Analysis flow step.

147

http://www.achronix.com

UG001 Rev. 5.0 - 5th December 2012

Advertising