BUCHI NIRWare User Manual

Page 191

Advertising
background image

NIRWare 1.5 Software Manual

NIRWare Suite

185

To open the Sample Manager proceed as follows:

In the file tree on the left side of the NIRWare Management Console select Sample Management. The
following dialog opens:

You can now open a submenu by clicking on their names in the file tree or in the center of the Sample
Management window.

The Sample Manager comprises the following menus:

Manage Samples

In this menu property information can be linked to sample information and reference values can be
entered. In addition sample names can be edited (in case of mistyping during data acquisition).

Manage Batches

This menu offers an overview of all batches.

Manage Properties

This menu offers an overview of existing property information. New properties for identification (e.g.
sucrose) with substance ID or quantitative property information (e.g. Fat [%]) can be entered.

Measurements

This menu gives access to all measurement sequences. Measurement sequences and
corresponding samples can be deleted (recorded with applications not used in routine) or hidden
(recorded with routine applications). Reports of measurement sequences can be reviewed, verified
and printed out.

Electronic Signatures on reports (sequence or batch) are applied here.

Reports for System Suitability Test (SST)

Overview over SST test results. SST reports can be reviewed and printed out.

Advertising