BUCHI NIRWare User Manual

Page 91

Advertising
background image

NIRWare 1.5 Software Manual

Tutorial

85

Both the creation of the routine use application and the integration of the calibration into this is performed

in the NIRWare Management Console (MC)

.

Load the application for reference measu

rement by choosing ‘Open’ from the ‘Application Designer’ in the

tree list. Then select the reference application from the list on the right:

The application is now available as a new point in the tree menu:

Advertising