Section 30.18.8 – Riverstone Networks WICT1-12 User Manual

Page 683

Advertising
background image

Riverstone Networks RS Switch Router User Guide Release 8.0 30-79

WAN Configuration

Scenarios for Deploying Channelized T1, E1 and T3

30.18.8

Scenario 8: Configuring Frame Relay over Channelized T1 Interfaces

In this scenario, a Channelized T1 link on an RS 8600 is used to connect a company’s headquarters to six remote sites.
The headquarters site has an RS 8600, with a Channelized T1 interface. The Channelized T1 interface is configured to
use the ESF framing. Each remote site is assigned a consecutive range of four timeslots as shown in

Table 30-6

. The

Frame Relay CIR and Bc for each remote site is also shown. Remote sites, rsite1 and rsite2, have two VCs on the
Channelized T1 interface.

Note

The timeslot assignments for each site need not be different; they are different in
this example for clarity.

Figure 30-12

shows the network layout for this scenario. The tables following the figure show the commands used to

configure the Channelized T1 interfaces for the routers at the various locations.

Table 30-6 Timeslot and CIR Assignments

Router

Timeslot
assignment

CIR

Bc

VC
Number

Subnet

rsite1

1-4

64000
64000

128000
128000

106
107

110.110.110.0
110.110.115.0

rsite2

5-8

64000
64000

128000
128000

106
107

110.110.120.0
110.110.115.0

rsite3

9-12

128000

256000

106

110.110.130.0

rsite4

13-16

128000

256000

106

110.110.140.0

rsite5

17-20

128000

256000

106

110.110.150.0

rsite6

21-24

128000

256000

106

110.110.160.0

Advertising