Mounting the system on a rack – ATL Telecom R1-SW Ethernet Switch User Manual

Page 56

Advertising
background image

R1-SW24L2B User’s Manual

4-4

Mounting the System on a Rack

To mount the Corecess R1-SW24L2B on a 19-inch rack, you need the following tools and
equipment:

y

A Philips screwdriver

y

Electrostatic discharge (ESD) grounding strap

y

Rack Brackets and Screws (provided along with the product)

¾

Two (2) rack brackets

¾

Four (4) binder-head screws (M5, 8mm)

¾

Eight (8) pan-head screws (M3, 6mm)

Note

: For more information about ESD, refer to the

Chapter 3 Before Installation

.

Once all the tools and equipment are prepared, mount the Corecess R1-SW24L2B on a 19-inch
rack according to the following procedure:

1. Place the Corecess R1-SW24L2B on a spacious floor or a sturdy table near the rack. And

check the tools and equipment.


2. There are four screw holes on each side of the Corecess R1-SW24L2B. As shown in the figure,

place the rack brackets to the screw holes and fix them using pan-head screws.










Advertising