I-7 commissioning 29, I-7 commissioning – West Control Solutions KS98-1 User Manual

Page 29

Advertising
background image

I-7

Commissioning

Before switching on the instrument, ensure that the following points are taken into account:

w

The supply voltage must correspond to the specification on the type label!

w

All covers required for contact protection must be fitted.

w

Before operation start, check that other equipment in the same signal loop is not affected. If necessary, appropri -
ate measures must be taken.

w

The unit is freely configurable. For this reason, the input and output behaviour is determined by the loaded engi -
neering. Before commissioning, make sure that the right instructions for system and instrument commissioning
are available.

Unless an application-specific engineering was loaded, the unit is equipped with the IO test engineering described on
page 49.

a

Before instrument switch-on, the plant-specific input and output signal types must be adjusted on the in -
strument, in order to avoid damage to the plant and to the device.
On instruments without default setting, partial I/O signal testing is possible.

a

The effect on connected equipment must be taken into account.

After supply voltage switch-on, start-up logo and

Main menu wait! are displayed, followed by display of the main

menu during several seconds .

Unless a selection is made during this time, the first operating page (e.g. a controller) is displayed automatically, wit -
hout marking a line or a field.

9499-040-82711

Commissioning

Connecting diagram i/o-modules

I-29