Powermax, Power supply component replacement 9-62, 105 service manual – Hypertherm Powermax105 Service Manual User Manual

Page 260

Advertising
background image

Power SuPPly ComPonent rePlaCement

9-62

powermax

105 Service Manual

8. Align and push the new solenoid valve onto the short gas tube until fully seated.
9. Secure the solenoid valve to the center panel by tightening the two supplied mounting screws to 23 kg cm

(20 in.-lbs).

10. Push the long gas tube into the solenoid valve until fully seated.
11. Push the pressure transducer into the solenoid valve until fully seated.
12. Route the solenoid valve power wires and connector through the grommet.

13. Plug the solenoid valve connector into the J6 header of the power board.

J1

J2

J3

J5

J6

J1

J2

J3

J5

J6

Short gas

tube fitting

Mounting screws

Long gas

tube fitting

Long gas tube

Short gas tube

Solenoid valve

Solenoid valve

power wires

Pressure

transducer fitting

Pressure transducer

Grommet

Advertising
This manual is related to the following products: