Yaskawa Large Capacity Sigma II Series User Manual

Page 47

Advertising
background image

2 Basic Operation

2.3.2 Main Circuit Wiring and Power ON Sequence

2-20

Using 400 V, 37 kW or 55 kW

„

Note

• Do not bundle or run power and signal lines together in the same duct. Keep power and

signal lines separated by at least 30 cm (11.81 in).

• Use twisted-pair wires or multi-core shielded-pair wires for signal and encoder (PG)

feedback lines. The length for wiring is 3 m (118.11 in) maximum for the reference
input line.

• Do not touch the power terminal even if power was turned OFF. High voltage may still

remain in SERVOPACK. Make sure the charge indicator is out first before starting an
inspection.

• Avoid frequently turning power ON and OFF. Since the SGDH SERVOPACK has a

capacitor in the power supply, a high charging current flows for 0.2 seconds when
power is turned ON. Therefore, frequently turning the power ON and OFF causes the
main circuit devices (such as capacitors and fuses) to deteriorate, resulting in unex-
pected problems.

L1/R

DC24P

PG

U

V

W

M

+24V

0 V

24

1Ry

31

32

1D

OFF

1MC

1Ry

ON

1MC

1SUP

1Ry

L2/S

L3/T

DC24N

B1

B2

DU

DV

DW

U(A)

V(B)

W(C)

1

1b

U

V

W

FG

FG

CN1

CN2

DB24

DB0N

1MCCB

R

S

T

1PL

1MC

ALM -

ALM+

+10

-15

%

DC24V

0V

380 to 480 V

SERVOPACK

SGDH-

†† DE

(Alarm lamp)

DB Unit

Fan

Main circuit
power

Thermal
protector

Three-phase
380 to 480 VAC

FIL

: Lamp for display
: Surge suppressor
: Flywheel diode

1PL
1SUP
1D

1MCCB
FIL
1MC
1Ry

: Circuit breaker (for inverter type)
: Noise filter
: Contactor
: Relay

Prepared by customer

Control power
supply

+

Advertising