SkyTrak 6036 Service Manual User Manual

Page 364

Advertising
background image

Electrical System

9.12

Model 6036 Legacy

Testing for Continuity

The following procedures verify good continuity in a
circuit.

With a DMM

1. Set the rotary dial of the DMM to the Ohm position.

2. Disconnect the power feed (i.e. fuse, control module)

from the suspect circuit.

3. Disconnect the load.

4. Press the MIN MAX button on the DMM.

5. Connect one lead of the DMM to one end of the

circuit to be tested.

6. Connect the other lead of the DMM to the other end

of the circuit.

7. If the DMM displays low or no resistance and a tone

is heard, the circuit has good continuity.

With a Test Lamp

IMPORTANT: Only use the test lamp procedure on low
impedance power and ground circuits.

1. Remove the power feed (i.e. fuse, control module)

from the suspect circuit.

2. Disconnect the load.

3. Connect one lead of the test lamp to one end of the

circuit to be tested.

4. Connect the other lead of the test lamp to battery

positive voltage.

5. Connect the other end of the circuit to ground.

6. If the test lamp illuminates (full intensity), then the

circuit has good continuity.

Testing for Short to Ground

The following procedures test for a short to ground in a
circuit.

With a DMM

1. Remove the power feed (i.e. fuse, control module)

from the suspect circuit.

2. Disconnect the load.

3. Set the rotary dial of the DMM to the Ohm position.

4. Connect one lead of the DMM to one end of the

circuit to be tested.

5. Connect the other lead of the DMM to a good

ground.

6. If the DMM does NOT display infinite resistance

(OL), there is a short to ground in the circuit.

With a Test Lamp

1. Remove the power feed (i.e. fuse, control module)

from the suspect circuit.

2. Disconnect the load.

3. Connect one lead of the test lamp to one end of the

circuit to be tested.

4. Connect the other lead of the test lamp to battery

positive voltage.

5. Connect the other end of the circuit to ground.

6. If the lamp illuminates (full intensity), then the circuit

has good continuity.

Testing a Fuse Powering Several Loads

1. Review the system schematic and locate the fuse

that is open.

2. Open the first connector or switch leading from the

fuse to each load.

3. Connect a DMM across the fuse terminals (be sure

that the fuse is powered).

• When the DMM displays voltage, the short is in

the wiring leading to the first connector or switch.

• If the DMM does not display voltage, refer to the

next step.

4. Close each connector or switch until the DMM or

analog tester displays voltage, in order to find which
circuit is shorted.

Testing for Electrical Intermittence

Perform the following procedure while wiggling the
harness from side to side. If possible, continue this at
6-inch intervals while watching the test equipment.

• Testing for Short to Ground

• Testing for Continuity

Testing Relays

Relays are used to control a large amount of current by
using a small amount of control current flowing through
the relay coil.

1. Be sure the vehicle is on a level surface, the

implement grounded, park brake engaged, engine in
the OFF position and negative battery cable is
disconnected.

Advertising