SkyTrak 6036 Service Manual User Manual

Page 63

Advertising
background image

3.23

Model 6036 Legacy

Boom

Note: ALWAYS replace elastic-lined nuts with new
elastic-lined nuts to help ensure proper fastening.

13. After the pivot pin and shims are in place, use a

tapered punch to align the capscrew hole in the pin
with the mounting holes in the hub. Insert the
capscrew (Fig. 3-52, 5) through the hub and the pin.
Secure the capscrew in place with a new 5/8-11
elastic locknut (6). Tighten the elastic locknut securely.

14. Repeat Step 13 to install the pivot pin on the other

side of the boom.

Figure 3-52 Install the Boom Pivot Pin and Shims

15. Align the rod end of one of the lift/lower cylinders

(Fig. 3 -53, 1) with the self-aligning bearing on the
outer boom assembly.

16. Coat the entire lift/lower cylinder pivot pin (Fig. 3-53, 2)

with anti-seize compound. Insert the pin through the
rod end of the cylinder and the self-aligning bearing.
If necessary, use a rawhide hammer to install the pin.

17. Use a tapered punch to align the capscrew mounting

hole in the pin with the mounting tabs on the rod end
of the cylinder. Secure the pin in place with the
capscrew (Fig. 3-53, 3) and a new 1/2-13 elastic
locknut (4). Tighten the elastic locknut securely.

18. Repeat Steps 15-17 to install the lift/lower cylinder

on the other side of the outer boom.

Figure 3-53 Install the Lift/Lower Cylinder

MA6590

1

6

2

3

4

5

MA6470

3

4

2

1

Advertising