Metrohm viva 1.0 Manual User Manual

Page 52

Advertising
background image

2.3 Formula editor

■■■■■■■■■■■■■■■■■■■■■■

40

■■■■■■■■

viva 1.0

Operand1

Operand2

Result

1

0

1

0

0

0

Examples

Operand1

Operand2

Result

Example

Remark

Operands of the same type:

Number

Number

Number

5 OR 4 --> 1

4 OR 0 --> 1

Numbers greater than 1 are automati-
cally interpreted as 1 (true)

Text

Text

Number

"Metrohm" OR "AG" --> 1

"" OR "Metrohm" --> 1

"" OR "" --> 0

An empty character string ("") is inter-
preted as 0 (false), everything else as 1
(true). The first operation therefore cor-
responds to 1 OR 1 --> 1

Time

Time

Number

Time(1999;10;07) OR
Time(1964;02;03) --> 1

Time(): see Time(Date)

Operands of a different type: The operand which does not correspond to the result type is converted to the rele-
vant result type before the operation.

Number

Text

Number

1.2 OR "1.2" --> 1

0 OR "" --> 1

Before the operation, the operand of
the Number type is converted to the
Text type, as a conversion from Text to
Number is not useful. During the sec-
ond operation, the 0 is therefore con-
verted to "0", which corresponds to the
logical value 1 (true), as every character
string that is not empty is interpreted as
1.

Text

Number

Number

"Metrohm" OR 1.2 --> 1

The same rules apply here as for the pre-
vious operation.

Number

Time

Number

2.0 OR Time(1999;10;7) --> 1

0 OR Time(1964;02;03) --> 1

Before the operation, the operand of
the Date/Time type is converted to
Number and all dates since December
30, 1899 are interpreted as 1 (true).

Time

Number

Number

Time(1999;10;7) OR 2.5 --> 1

The same rules apply here as for the pre-
vious operation.

Text

Time

Number

"Metrohm" OR
Time(1999;10;7) --> 1

Before the operation is carried out, the
operand of the Date/Time type is con-
verted to the Text type, and every non-
empty character string is interpreted as
1 (true).

Time

Text

Number

Time(1999;10;7) OR
"Metrohm" --> 1

The same rules apply here as for the pre-
vious operation.

Advertising