Before you begin the maintenance tests, Before you begin the maintenance tests -2 – ZOLL R Series Monitor Defibrillator Rev J User Manual
Page 12

R Series Service Manual
1-2
9650-0903-01 Rev. J
•
16.0 Advisory Message Test (Manual/Advisory Units)
•
•
18.0 SpO2 Monitor Test (for SpO2 Option)
•
19.0 EtCO2 Monitor Test (for EtCO2 Option)
•
20.0 Barometric Pressure Calibration Check
•
21.0 CO2 Accuracy Check (for EtCO2 Option)
•
22.0 NIBP Transducer Calibration Test
•
23.0 NIBP Monitor Test
•
Before You Begin the Maintenance Tests
•
Assemble the tools or specialized testing equipment listed in the “Equipment You Need to Perform the Maintenance Tests” section shown below.
•
Keep an extra fully charged ZOLL SurePower defibrillator battery available.
•
Schedule an hour to conduct the entire maintenance test.
•
Photocopy the checklist at the back of this document and use the copy to record your results. As you conduct each step of a procedure, mark the Pass/
Fail/NA check boxes on your checklist and then save it for your maintenance file.
•
Perform the tests in the order presented.
•
Perform all the steps of each test procedure.
•
Complete all the steps of the procedure before evaluating the test results.
Equipment You Need to Perform the Maintenance Tests
This section lists equipment that we use to perform the maintenance tests that we describe in this chapter. You can substitute an equivalent device for a
listed device; however, not all simulators and analyzers will produce the same results. Be sure to follow the manufacturer’s recommendations for
conducting the maintenance tests.
We recommend the use of the following equipment when performing E Series Maintenance Tests
•
ZOLL Medical Electrode Adapter from Fluke Biomedical (DNI part number 3010-0378).
•
Fluke Impulse 4000 Defibrillator Analyzer with 1.06 software or higher.
•
Fluke Biomedical International Safety Analyzer.
•
2 red miniature alligator to miniature alligator leads.