Rockwell Automation 2711E-xxxx PanelView Operator Terminals User Manual User Manual

Page 184

Advertising
background image

Index

I–5

Publication 2711E-821 – January 1998

Messages

fault, 8–1, 8–3
mistake, 8–4

Minor Terminal Fault window, 5–51

Mistake messages, 5–51, 8–4

Mode select keyswitch, 2–9, 3–11, 4–8

setting for power up, 5–1

Modes

Configure, 5–1
Run, 5–1

Mounting clips, 2–4, 3–5

Mounting options

1000e operator terminals, 2–4
1200e operator terminals, 3–5
1400e operator terminals, 4–4

Mounting studs, 3–5

N

NEMA 4X rating, 3–6

NEMA standards

1000e operator terminals, A–1, A–2
1200e operator terminals, B–1
1400e operator terminals, C–1, C–2

Network File Transfer tab, 5–13

O

Objects, retentive, testing, 6–4

Operating modes, 5–1

Operator access codes, 5–25

P

PanelBuilder 1200 Development Software

for Windows, using application files,
1–1

PanelBuilder 1400e Configuration Software,

about, 1–11

PanelBuilder Development Software for

DOS, using application files, 1–1

PanelView operator terminals, configuring,

5–1

Parity, 5–7

Pass-Through

Address Source, 5–14
Control Byte, 5–22
default settings, 5–14
parameters, 5–13

Pass-Through application file transfers,

5–13

PCMCIA. See Memory cards

Performing a Serial Firmware Upgrade, D–7

PLC, 1–14, 5–1, 5–32

communicating with terminal, Run mode,

2–9, 3–11, 4–8

connecting to 1000e operator terminals,

2–13

connecting to 1200e operator terminals,

3–15

connecting to 1400e operator terminals,

4–12

connecting to a terminal, 6–3
publications, P–2
requesting screen prints, 5–41
required for Pass-Through, 5–15

PLC communication problems, 8–7

Data Highway Plus, 8–8, 8–9

PLC Remote I/O communications

1000e operator terminals, A–5
1200e operator terminals, B–4
1400e operator terminals, C–5

PLC-5 family, rack address ranges, 1–14,

1–16

PLC-5C programmable controllers,

ControlNet PLCs, 1–18

PLC-2 family, rack address ranges, 1–15,

1–16

PLC-3 family, rack address ranges, 1–14,

1–16

POST. See Power On Self–Test

Power

connecting to 1000e operator terminals,

2–10

connecting to 1200e operator terminals,

3–11

connecting to 1400e operator terminals,

4–8

Power connector

1000e operator terminals, 2–10
1200e operator terminals, 3–12

Power On Self-Test, 5–1

Power up

terminal, 5–1
tests, 5–1

Power-up screen, for application, 6–3

Printer

cable, 5–9, 5–42
default settings, 5–41
errors, 5–42

Printer cable

for 1000e operator terminals, 2–11
for 1200e operator terminals, 3–13
for 1400e operator terminals, 4–10

Advertising