leak test 2 (system leak test)

Purpose: Tests for leaks to the atmosphere from the gas system.
Test description: The gas for the process selected is purged through the gas system. The metering console valves

(B1-B4), and the inlet valves (for the selected process) in the selection console are closed. Gas

pressure is now trapped in the system. The trapped pressure is monitored. Code number 14 (cut gas

channel number 1 failed) or 15 (cut gas channel number 2 failed) will be displayed if the pressure

drops faster than 0.1 4 bar/minute (2 psi/minute). Code number 13 will be displayed if the pressure

decreases within the acceptable limit of 0.14 bar/minute (2 psi/minute).

Procedure:
1. Perform System Leak Check on the CNC controller.
2. Turn OFF power and then turn ON power. This will purge gases from the system.

leak test 3 (proportional valve test in the metering console)

Purpose: Tests the Burkert valves (B1 and B3) in the metering console to ensure that they are working within the

correct parameters.

Test description: 130-amp mild steel consumables, and the 30-amp O

2

/O

2

mild steel process are used for this test,

because there is a known flow rate.

Gas flows from the torch, and the Burkert valve that controls the plasma gas channel (B3) attempts

to maintain the set plasma gas pressure (monitored by P7 and P8) by adjusting the valve dynamically.

The signal percentage to the valve is measured (example – 65% on), and the value is checked

against the expected range (55% – 75%). The test is successful if the signal percentage is within the

expected range. Code number 14 (shield gas channel failed) or 15 (plasma gas channel failed) will be

displayed if the test fails. The same test is repeated for the Burkert valve that controls the shield gas

channel (B1).
For the next part of the test, the Burkert valve that controls the plasma gas channel (B3) is closed,

and the pressure is measured milliseconds later (pressure should decrease). The test is successful

if the pressure is below a given limit (0.69 bar [10 psi]). The same test is repeated on the shield gas

channel (B1).
Code number 16 (plasma ramp-down test failed) or 17 (shield rampdown test failed) will be displayed

if the signal percentage is out of the expected range. Code number 13 (test passed) will be displayed

if the signal percentage is within the expected range.

Procedure:
1. Install 130-amp mild steel consumables in the torch and select the 30-amp O

2

/O

2

mild steel process.

2. Perform Metering Valve Flow Check on the CNC controller (test 3).

3. Turn OFF the power and then turn ON the power. This will purge gases from the system.

Advertising