 b. Remove the 2 screws fastening the top cover to the unit (one per side

towards the rear).

 c. Slide the cover backwards until it clears the analyzer’s front bezel.

 d. Lift the cover straight up.

4. Inspect the interior of the instrument to make sure all circuit boards and other

components are in good shape and properly seated.

5. Check the connectors of the various internal wiring harnesses and pneumatic hoses

to make sure they are firmly and properly seated.

6. Verify that all of the optional hardware ordered with the unit has been installed.

These are checked on the paperwork (Form 04490) accompanying the analyzer.

3.2. VENTILATION CLEARANCE

Whether the analyzer is set up on a bench or installed into an instrument rack, be sure to
leave sufficient ventilation clearance.

AREA

MINIMUM REQUIRED CLEARANCE

Back of the instrument

10 cm / 4 inches

Sides of the instrument

2.5 cm / 1 inch

Above and below the instrument.

2.5 cm / 1 inch

3.3. 9110TH/M LAYOUT

Figure 3-1 shows the front panel layout of the analyzer, and Figure 3-4 shows the rear
panel with optional zero-air scrubber mounted to it and two optional fittings for the IZS
option. Figure 3-5 shows a top-down view of the analyzer. This configuration includes
the IZS option, zero-air scrubber and an additional sample dryer (briefly described in
Section 1.4).