3 va track, Va track – Metrohm viva 1.1 User Manual

Page 413

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Method

viva 1.1

■■■■■■■■

401

NOTE

No voltammetry commands can be inserted in a normal track (see
Chapter 5.5.2.11.1, page 606)
.

5.5.1.2.3

VA track

Subwindow: Method

A VA track is a track for VA measuring commands and can be created
manually by the user with Insert

New track... VA track or with the

icon. It starts with the VA TRACK command (see Chapter 5.5.2.9.4,

page 586) and ends with the END command.

VA tracks can be called with the commands CALL VA, CALL VMS, CALL
ELECTROLYTE
, CALL INTERCEPT or CALL COND and by entering the
corresponding name. Branches and parallel processes can be realized in
this way. The following two cases are distinguished when calling VA
tracks:

Sequentially running VA track
If the Return immediately check box is deactivated in the VA
TRACK
command, then all commands of this track are processed one
after the other when the VA track is called. Afterwards, the track gives
a response to the CALL command that is calling and the run is contin-
ued from there.

VA track run in parallel
If the Return immediately check box is activated in the VA TRACK
command, then the corresponding command is marked with an arrow
(see below). When the VA track is called, then the commands in this
track are processed, but the track responds immediately to the CALL
command that is calling. In this way, the run in the calling track is also
continued, i.e., the two tracks are processed in parallel.

Sequentially running VA track VA track run in parallel

Advertising