Unpacking and inspecting the equipment – Nortel Networks 9150 User Manual

Page 119

Advertising
background image

Remote Gateway 9150 Installation and Administration Guide

89

January 2005

Installing the Remote Gateway 9150 unit

Unpacking and inspecting the equipment

Before you unpack the equipment, ensure that your work area is safe from
electrostatic discharge. For more details, refer to “Implement the following
precautions, as recommended by computer and telephone equipment
manufacturers:” on page 86
. Before you install the Remote Gateway 9150 unit,
ensure that the package contents are all present and are not damaged.

To inspect the package contents:

1

Inspect the Remote Gateway 9150 unit’s shipping box for damage.

2

Open the box and remove its contents.

3

Verify that, in addition to this guide, the following items are present:

4

Visually inspect each item for obvious faults or damage.

If any component is damaged, report the damage immediately to your Nortel
distributor and the carrier who delivered the equipment.

Item

Remote Gateway 9150 unit

Package containing rubber feet and rack-mounting brackets with
screws

Power cord and power supply

Note: In North America, the power cord and power supply are
included inside the Remote Gateway 9150 box. In all other
regions, the power supply is provided inside the box and the
power cord for your region is provided outside the box.

RS-232 serial cable

Remote Gateway 9100 Series and RLC Release Notes
(NTP 555-8421-102)

Remote Gateway 9100 Series Product CD-ROM

Advertising