Nortel Networks 9150 User Manual

Page 445

Advertising
background image

Remote Gateway 9150 Installation and Administration Guide

415

January 2005 Display

log

definitions

Statistic

Definition

LOG NUMBER

5

DESCRIPTION

This log indicates that the QoS of the IP network degraded and the
system transitioned to the PSTN.

SEVERITY

NORMAL

TASK

QoS Transitioning

PRODUCT

RLC, 9150, 911x

CANCELLATION

Log number 2 - FB_RECOVERY_LOG_ID

ACTION TO BE TAKEN

Investigate why the IP network was determined to be below VoIP
quality. Review the Engineering Guidelines.

PARAMETERS

1) Unit ID of the Remote Gateway 9100 Series unit for which the IP

QoS has degraded

DISPLAYED TEXT

Transition to Remote Site: P1

PRODUCES HOST PBX
ALARM AND ALERT

Yes

LOG NUMBER

6

DESCRIPTION

This log indicates that the QoS of the IP network recovered and the
system transitioned to the IP Network.

SEVERITY

NORMAL

TASK

Fallback

PRODUCT

RLC, 9150, 911x

CANCELLATION

Log number 1 - FB_FALLBACK_LOG_ID

ACTION TO BE TAKEN

Investigate why the IP network was determined to be below VoIP
quality. Review the Engineering Guidelines.

PARAMETERS

1) Unit ID of the Remote Gateway 9100 Series unit for which the IP

QOS has recovered

DISPLAYED TEXT

Recovery to Remote Site: P1

PRODUCES HOST PBX
ALARM AND ALERT

Yes

Advertising