Led indicator test sequence – Nortel Networks 9150 User Manual

Page 142

Advertising
background image

112

Remote Gateway 9150 Installation and Administration Guide

Installing the Remote Gateway 9150 unit

Standard 3.1

LED indicator test sequence

The following diagram shows the LED indicators on the front panel:

During the power-up cycle, the LED indicators behave as follows:

1.

All LED indicators light for about 15 seconds.

2.

The Module LED indicators light individually in sequence (1 through 8).

3.

All LED indicators light.

4.

All LED indicators except the Status LED go out. The Status LED remains
lit.

Note: Steps 2 through 4 take about 4 to 5 seconds.

After this point, the Remote Gateway 9150 unit is functional.

Notes:

!

The ETHERNET TX and RX and module (ISDN BRI) LED indicators
flash only when transmit and receive activity is present on those interfaces.

!

The ETHERNET COLL LED indicator flashes when a data collision
occurs on the line.

RX

TX

V.35

STATU

S

4

3

2

1

L2

L1

L2

L1

L2

L1

L2

L1

MODU

LE

COLL

RX

TX

ETHER

NET

POWE

R

G101402

Power

Note: The V.35 LED indicators are present but are not functional.

Ethernet

Modules

V.35

Status

Remote Gate

way 9150

Advertising