Overview, Network planning, Remote gateway 9150 forms – Nortel Networks 9150 User Manual

Page 402: Data entry form completion sequence

Advertising
background image

372

Remote Gateway 9150 Installation and Administration Guide

Planning forms

Standard 3.1

Overview

This appendix provides several forms that you can use to plan and record the
various data necessary for proper configuration of a Remote Gateway 9150 unit
at your site.

Note: RLC forms are provided in the Reach Line Card Installation and
Administration Guide
(NTP 555-8421-210).

Network planning

To help you plan your Remote Gateway 9100 Series network, study the network
diagram and sample configurations provided in Appendix B, “Sample
configuration files.”
The information provided in this appendix demonstrates the
relationships between RLC and Remote Gateway 9150 configuration settings.

Remote Gateway 9150 forms

Use the Remote Gateway 9150 forms to record information and calculate
needed resources for a Remote Gateway 9150 unit. For more information about
using these forms, refer to “Planning the configuration” on page 81.

Data entry form completion sequence

Information from some forms might need to be copied to other forms. Nortel
recommends that you complete the data entry forms in the following sequence:

1.

Remote Gateway 9150 Configuration Information—Stations form

2.

Reach Line Card Connection Information (for either the 16-port or 32-port
RLC)

3.

Remote Gateway 9150 Configuration Information—Network Connections
form

Advertising