ITG engineering guidelines

Figure 24
IP Trunk 3.01 (and later) network engineering process

Three preliminary steps must be undertaken.

1. Calculate IP Trunk 3.01 (and later) traffic. Estimate the amount of

traffic that the system will route through the IP Trunk 3.01 (and later)
network. This total must include the estimated traffic between the IP
trunk cards and the Signaling Server. This in turn places a traffic load
on the corporate intranet. This is described in

"IP Trunk 3.01 (and later)

traffic engineering" (page 95)

.