Chapter 8: Maintenance and Inspection

Page 8-2

8.1

Inspection Items

A scheduled inspection is recommended to keep the FUSION System in the best condition. A

preventive maintenance routine should be set-up. Recommended inspection schedules are

given for each item.

WARNING:

Follow Lockout/Tagout and other safety precautions when connecting or

disconnecting cabling, wiring, and equipment. Always verify the System is disabled

prior to touching any moveable components

.

8.1.1 Nutrunner (Tool)

Recommended Schedule: Quarterly

It is important to keep the nutrunner tools clean and properly adjusted to ensure correct fas-

tening and accurate system outputs. Inspect each tool, and ensure the following conditions

exist:

•

All environmental conditions are within the specified ranges.

•

The duty cycle is within specifications, and the motor is producing normal heat levels.

•

The tool is producing normal levels of noise and vibration (no irregular noise)

•

The tool is free from excessive contamination and foreign matter.

•

The tool is securely mounted, with mounting bolts properly tightened.

•

The Tool cable is securely connected to the tool.

8.1.2 Tool Cable

Recommended Schedule: Quarterly

This cable connects the tool to the Controller unit. Ensure the following conditions are met:

•

The cables are free from unnecessary binding, force and tension and are free to move.

•

The cables are in good condition, sufficiently insulated (no cuts) with no indication of broken

wires.

•

The cables are free from excessive contamination and foreign matter.

•

The cables are securely connected to the Controller unit and to the nutrunner (connectors are

tight).

•

The cables are free from heat distortion, and are not warm or hot to the touch.

•

The cables and cable connectors are securely and correctly fastened.

(See 4.11.1 for Cable Installation Guidelines)