FEC FUSIONE-HS-2 User Manual
Page 83

FEC FUSION Operations Manual
Chapter 4: System Setup and Wiring (Rev. 2.1)
Page 4-45
Termination
Termination of the RIO network requires a terminating resistor at each end of the network. If
this is the last module on the network, turn “ON” the terminating switch located on the inter-
face board.
Specifications
AB Remote I/O Specifications
Speed
57.6, 115, 230K baud - Selectable
Rack Addresses
0-59
Nodes
up to 240 1/4 racks
Rack Configuration supported
1/4
Distance
57.6k - 3048 meter
115K - 1524 meter
230K - 762 meter
Cable
78 ohm Twinax
Belden #9463 or equivalent
Communications Type
Master/Slave
AB Remote I/O connector
Pin 1
COM line
Blue
Pin 2
GND
Shield
Pin 3
COM line
Clear
Status LED
Status LEDs
Error
OFF
Normal Operation
ON - Red
Bus off / Error
Active
OFF
No Communication
ON - Green
Communication Active
Power
OFF
Power Off
ON - Green
Power On