Mapping the system structure in the »Engineer« project

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5

Mapping the system structure in the »Engineer« project

The »Engineer« provides for a cross-device parameterisation, configuration, and diagnostics of

individual components and machine control systems. For this, map the system structure of your

automation system in the »Engineer«.

Getting started
In the project tree/device tree, you create the hierarchical project structure that usually results from

the following components:

• ... the functional division of the whole system into different partial systems/modules

(e.g. conveyor and press) as well as from

• ... components of the automation system (e.g. inverters, control systems, motors).

Tip!
On the basis of your system you can represent this structure 1:1 in the »Engineer« project.
You can modularise the structure of the machine system with several system modules/

axes.

General procedure

Representing the real system structure in the project tree

From here you can add items to the system structure by inserting other system modules and/or

axes: Right-click

the desired project elementInsert system module/Insert axis

Extending the system structure

Inserting system modules

( 47)

Inserting an axis

( 48)

Step

Activity

1st

Modularising with system modules and axes ( 47)

2nd

Inserting components ( 51)

3rd

Inserting a gearbox ( 67)

4th

Documentation - Add project details ( 71)

• If you create a new (empty) project, all that

can be seen at first in the Project tree is the

Project root including the project name.

• In our example project, the projected

system includes a Packing module system

module.

• The packing module is divided into two

axes: Conveyor and Press.