Establishing an online connection – Lenze Engineer v2.21 User Manual

Page 93

Advertising
background image

Lenze · Engineer · 2.13 EN - 10/2014

93

Establishing an online connection

Going online

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The PG/PC station is active in the »STEP 7« project.

• The

icon symbolises that the connection is active.

9. Transfer the TCI communication parameters in the HW Config in the context menu of the

connection by executing the Start device toolL-force Engineer command.
If the previously created »Engineer« project is open, confirm the query with Yes.

Alternatively, the »Engineer« is started and the corresponding project must be opened.

• The query indicates that the opened »Engineer« project has not been set to a TCI

communication path. By confirming the query with Yes, the »Engineer« automatically

accepts the TCI communication settings from »STEP 7«.

10. The message window indicates the acceptance of the TCI communication parameters.
11. Going online: OnlineSet communication path and go online (F4)

• If the acceptance of the communication parameters has failed, the parameters can be

entered manually by clicking the Search/Enter button.

• Select STEP 7 Communication Server as bus connection.
• Click the Accept button.
• Click the Connect button to go online.

Advertising