Verilink Access Manager 2000 (896-502037-001) Product Manual User Manual

Page 227

Advertising
background image

Configuring circuits

Access Manager 2000 User Manual

5

-103

If you ever edit a circuit or route with a changed node name, then the
node name must be updated before Access Manager recognizes the node
and accepts the changes to the circuit/route definition.

Before you can define a circuit, you must already have defined the nodes
and circuit elements at each end of the circuit. If you have questions, refer
to the configuration steps defined in “Summary of tasks” on page 5 -5.

To define a new circuit:

1. At the Main Menu, type

C

to bring up the Configuration Menu.

2. Then,

type

C

to select

Revise Circuit Definitions

. The

Configuration: Circuit screen of now appears.

3. From

the Configuration: Circuit screen, type

A

to bring up the Add

Circuit Definition screen.

4. When you have finished entering the circuit definition, press the

key to accept your entries. After the database has been

updated, you are returned to the Add Circuit Definition screen.

Defining a new
circuit

F5

Advertising