Verilink Access Manager 2000 (896-502037-001) Product Manual User Manual

Page 98

Advertising
background image

Configuring Access Manager

4-12

Access Manager 2000 User Manual

b. The CSUs must have collection of performance data enabled.

c. The parent nodes of the CSUs must be configured as

Installed and Operational

.

For circuit elements accessed through the 4-kbps ESF Data Link, a circuit
must be built between the near and far circuit elements in order to collect
far-end data. This is because all data is stored under the circuit element’s
parent node name.

Note:

To retrieve data from a far-end CSU, the near-end CSU must be
set to retrieve data.

You must specify the hour when the 12-hour polling cycle for collection
of performance data is initiated.

To specify the polling hour:

1. From the Installation screen, select

Hou

. The Edit Poll Hour

screen appears.

2. Choose one of the following options:

To specify the polling hou , enter a value from 1 to 12 for the
polling hour from 1 to 12, and press

to save the value.

To disable performance data polling, enter

ZERO

or a number

equal to or greater than 13.

To exit from this option without saving changes, press

.

The Access Manager database provides space for the event log, alarm log,
and performance database (that is, log). You may allocate how much
space is given to each log.

The default allocations, at time of shipment, are shown in Table 4-1,
“Database allocation at time of shipment,” on page 4 -
13.

F5

F2

Assigning
database
allocations

Advertising