Verilink Access Manager 2000 (896-502037-001) Product Manual User Manual

Page 327

Advertising
background image

Testing CSU

Access Manager 2000 User Manual

8-57

The test signal is no longer applied to the circuit by the NCC (CCC)
or TAC, and all loopbacks are deactivated. If you select this option,
the test procedure is completed.

8. If you selected one of the

View

options, continue with this step.

If you selected

View Test Status Results

(from the

Select Test Activity screen), you are prompted to select the near-
end or far-end CSU. Enter your selection, and press

. Go

to Step 9.

If you selected

View Test in Progress

, go to Step 11.

9. The CSU Test Status screen is updated during the test once every 5

seconds (+/- 1 second). The status of this test can also be updated at
any time by pressing and releasing any key (except F2 or ESC). The
following results are displayed in the CSU Test Status Results
screen.

This screen displays the currently running test or, if no test is
currently running, the results of the previous test.

Test:

The first line shows the type of test signal currently being

applied and the direction of the signal.

Elapsed Time:

The amount of time which the screen has been

displayed.

F5

Advertising