Chapter 2 quick start, 1 introduction, 2 installation – INFICON Guardian EIES Controller User Manual

Page 25: 1 sensor installation, Chapter 2

Advertising
background image

2 - 1

IP

N 07

4-

51

7-

P1

D

Guardian Co-Deposition Controller Operating Manual

Chapter 2

Quick Start

2.1 Introduction

This section covers the minimum system connections and software setup needed
to run the EIES-IV Guardian system. Consult later chapters for more detailed
installation and operating instructions.

2.2 Installation

2.2.1 Sensor Installation

Placement of the EIES sensor is the most significant factor determining EIES
system performance. The sensor must be placed so that the material vapor flux
reaches the sensor without obstruction. The sensor opening must be oriented so
that material can pass through the sensor without accumulating inside the sensor,
with the smaller sensor cutout toward the flux. See

Figure 2-1

. See

Chapter 4

for

detailed installation instructions.

NOTE: The sensor will not pass through the 2.75 in.CF (NW35CF) port. If the

chamber is too small to allow installation from the inside, a 4.5 in. CF
(NW63CF) or larger flange adapted to the 2.75 in. CF flange is required to
allow the entire sensor to pass through.

Figure 2-1 Sensor Placement

Electrical Feedthroughs

For Sensor Filament

Sapphire Window

1.33 in. CF Flange

2.75 in. CF Flange

Telescoping Tubing

For Length Adjustment

Vapor

Flux

EIES Sensor

Advertising