2 sensor / feedthrough assembly – INFICON Guardian EIES Controller User Manual

Page 94

Advertising
background image

4 - 2

IP

N 07

4-

51

7-

P1

D

Guardian Co-Deposition Controller Operating Manual

4.2 Sensor / Feedthrough Assembly

The sensor will not pass through the 2.75 in.CF (NW35CF) port. If the chamber is
too small to allow installation from the inside by securing the sensor to the optical
tube and connecting the in-vacuum filament cable at the feedthrough and sensor,
a 4.5 in. CF (NW63CF) or larger flange adapted to the 2.75 in. CF flange is required
to allow the entire sensor to pass through.

Figure 4-1 EIES Single Sensor 016-600-Gxx

NOTE: jt type CAD drawings are available from INFICON to facilitate your

chamber design. Contact

INFICON

Thin FilmTechnical Support to obtain

these files.

Advertising