INFICON Guardian EIES Controller User Manual

Page 37

Advertising
background image

2 - 13

IP

N 07

4-

51

7-

P1

D

Guardian Co-Deposition Controller Operating Manual

The Film and Film Cal(ibration) tabs are for the selected film, Se. On the Film tab
set preconditioning Ramp1 Power, Ramp1 Time, and Soak1 Time as shown in

Figure 2-11

.

Figure 2-11 Film Tab Settings

Advertising