2.2.4 Controller Installation

Mount the controller in a location that allows easy wiring access to the EIES sensor
and detector assemblies. The controller may be placed up to 25 ft. from the EIES
computer. See

section 4.6, Controller Installation, on page 4-17

CAUTION

Properly ground the system. Connect a heavy braided
cable from the EIES controller to vacuum chamber
ground. If you are using multiple power supplies, be sure
that the outer conductor of each BNC cable is at system
ground potential.

Digital Inputs and Relays: Consult

Chapter 4

for information on digital I/O wiring.

CAUTION

A system interlock must be present. Plug the Interlock
connector 782-505-077 (jumpers pin 1 to 10 and pin 3 to
16) supplied in the 782-703-G1 Ship Kit into the Inputs
connector. Emission cannot be turned on unless this
connector or an equivalent system interlock is present.

Power: With the power switch OFF, connect the AC mains to the controller power
input. The controller automatically accepts 100-240 V (ac), 50-60 Hz.

NOTE: Observe the power-up sequence described below to avoid power glitches

appearing at the evaporation power supply outputs during startup.

WARNING

Power up in this sequence: Press the power switch on
the Guardian controller. Next, start the EIES Software.
Last, turn on the evaporation power supplies.

WARNING

Verify that the power cable provided is connected to a
properly grounded mains receptacle.