Downloading and uploading over the data highway, 6ć16, File operations chapter 6 – Rockwell Automation 2711 PANELBUILDER SOFTWARE USER MANUAL User Manual

Page 190

Advertising
background image

File Operations

Chapter 6

6-16

PanelBuilder version 3 and later software and PanelView version 3 and
later firmware support the uploading and downloading of application files
over the Allen-Bradley Data Highway +, using the PLC-5 Remote I/O
Pass-Through feature, with the PanelView terminal connected as a remote
I/O device to the PLC-5. This feature allows you to download application
files to PanelView terminals without changing cabling on the terminals,
and without having to go from terminal to terminal with a PC for direct
downloading.

Figure 6.14

Connecting the Development Computer and PanelView Terminal through a Data

Highway + and PLCĆ5

23633

PanelView

PLC-5

DH+

Remote I/O

These PLC revisions support the Pass-Through feature:

Table 6.D

PLC Series/Revision Requirements for PassĆThrough File Transfer

Processor

Series

Revision

PLCĆ5/11

All

All

PLCĆ5/15

B

N or later

PLCĆ5/20

All

All

PLCĆ5/25

A

J or later

PLCĆ5/30

A

B or later

PLCĆ5/40

A

B

E or later

B or later

PLCĆ5/60

A

B

E or later

B or later

PLCĆ5/250

All

All

Downloading and Uploading

over the Data Highway +

Advertising