File Operations

Chapter 6

6-27

If both operations fail, the application file in the terminal may be
corrupted. The files in the computers will not be affected, so the best thing
to do is to try the download again immediately, but from only one
computer.

Uploading Over the Data Highway +

To upload, both PanelView and the PLC-5 must be active on the network
and in Run mode. Unlike download, the terminal will continue to function
in Run mode throughout the upload.

On the development computer, open the Transfer menu and choose
Pass-Through Upload from PanelView (DH+ and Remote I/O). Then use
the following menu to configure the PanelView terminal location on the
network, and initiate the upload.

Figure 6.25

PassĆThrough Upload from PanelView Window

22584

Pass-Through Upload from PanelView (DH+ and Remote I/O)

Start Upload

Load PanelView Location Data

PanelView Location Data

Rack

Group

Module (High/Low Byte)

PLC Type

PLC DH+ Address (0-77)

Local Bridge Address

Not Used

Remote Bridge Address

Not Used

Programming Terminal Configuration

Quit

The fields in this window are:

Start Upload. If the PanelView terminal location data and

programming terminal configurations are correct, the upload will begin.
If an error is detected, a warning message will be displayed.

Load PanelView Location Data allows you to get the location data

from an application file. The following window appears: