O_454, O_455, O_456 – BUCHI DuMaster D-480 User Manual

Page 153

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

7 - Using the instrument

153

Single peaks

In general a single peak looks as follows:

Superimposed peaks

These are two peaks where one superimposes the other. Peak 1 is designated as "socket" and peak
2 is designated as "superimposed". The following picture shows such a run.

Melted peaks

These are two consecutive peaks where the second peak already starts although the first is not yet
finished. The graphic appears as follows:

Advertising