Removing and installing the drying tubes, O_3758, O_3759 – BUCHI DuMaster D-480 User Manual

Page 236: E 236)

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

8 - Maintaining the instrument

236

Notes regarding further operation

The drying tube fillings must be replaced regularly in order to ensure correct readings. The drying
agent is charged with an indicator which shows the used up zones of the tube. If ¾ of the desiccant is
discolored, the filling must be replaced.

Removing and installing the drying tubes

Function of the drying tubes

The drying tubes bind traces of water that would impair both the IR signal (blank value) and the
lifetime of the IR detector.

Location of the drying tubes

The following picture shows the location of the drying tubes (1, 2) with the front door open:

Process

The section is divided into the following phases:

Preparing the instrument, gas pressure

Removing the drying tubes

Installing the drying tubes, getting the instrument ready to measure

Safety instruction

Strictly observe the safety instruction "Installing/removing the drying tube" under Warning notes
during operation
(on page 24).

Phase 1, Preparing the instrument, gas pressure

Safety instruction

Strictly observe the safety instruction "Gas pressure" under Warning notes during operation (on
page 24).

Advertising